During the last few moths our company has been carrying out works of mechanical assembly of racks and piping installation, in cooperation with engineering companies Anerpro Energía y Proceso S.L. and SPX Flow Technology SAS,
During the last few moths our company has been carrying out works of mechanical assembly of racks and piping installation, in cooperation with engineering companies Anerpro Energía y Proceso S.L. and SPX Flow Technology SAS,
During the last 3 months our company has carried out several works of modification and extension of product lines, and installation of stainless steel piping for procces and service fluids
Since last July, our company has been carrying out assembly and installation works of type 304L and 316L millimetric and SCH10 stainless steel piping, in cooperation with engineering companies Anerpro Energía y Proceso S.L. and SPX Flow Technology SAS,
During the months of March and April this year we have accomplished the projected works of replacement of two alembics
During last December, we have accomplished the works of replacement of the saturated steam feed lines and the condensate return piping for 2 alembics
Between July and August this year, we were contracted by the company Bontoux SA to manufacture a stainless steel piping assembly for the renovation and replacement of 2 alembics
In March this year, we were contracted to manufacture a stainless steel piping assembly for a steam system and process lines, to be subsequently installed in a factory in southern Italy for the extraction of essences from citrus fruit.
Between April 2011 and February this year we have carried out several works of fabrication, renovation, maintenance, assembly and dismantling of stainless steel installations